Slavneft-JANOS, oil refinery plant

Alexander Kulikov

General Manager

Slavneft-JANOS, JSC is the largest oil refinery plant of the Northern region of Russia. The company Electronika together with the specialists of the enterprise designed and installed an integrated security system at the facility from 2003 to 2008. The project was awarded by a national prize for safety ZUBR-2008.

The project was implemented in stages for 5 years, and, as time shows, we were able to lay the potential in it for years to come. The solution used unconventional for that time approaches and methods of building systems, which are now standard at the legislative level.

Tasks
01.

Creation of a security system that covers the entire area of the enterprise, within the framework of the project for the reconstruction and technical re-equipment of the plant.

Business size

The largest oil refinery plant in the Northern region of Russia.

Processing capacity

Processing capacity - 15.2 million tons of hydrocarbon feed a year.

Assortment

Assortment-more than 100 names.
Solution
01.

Development of the integrated plant safety system’s concept.

02.

The complex was designed and implemented<br> <ul class="detail-solution__list-wide"> <li>Access control systems (16 checkpoints (including automobile);</li> <li>Videosurveillance systems (more than 400 video cameras in a united system);</li> <li>System of the perimeter’s engineering-technical protection (14 km);</li> <li>Security alarm systems of objects;</li> <li>Systems of technological videosurveillance of installations;</li> <li>Data collection and processing systems;</li> <li>ISB integration with the ERP system of the enterprise;</li> </ul>

03.

Technical support, maintenance and modernization of the complex.<br> <br>

Customer benefits
  • There was created the ACS system integrated into the enterprise management software.
  • The requirements of the "Regulations on the internal facility and throughput regime of Slavneft-YANOS" were implemented.
Customer feedback

The videosurveillance system of the plant’s management building included all modern trends in the construction of videosurveillance systems. As a result, we got a combination of analog, megapixel and IP cameras at the facility, combined into a united multi-level video surveillance system.

The implementation of the guard’s workplace now allows security personnel to respond quickly to illegal actions in real time.

The access control system fully implements the requirements of the regulations at the internal facility and access regime of Slavneft-YANOS, including such functions of the badge room as the issuance and collection of one-time passes.

M. N. Rumyantsev

Deputy head of resource protection department

Features
  • Implementation of an integrated solution for the organization of automated access through the checkpoint.

  • Pedestrian and vehicle checkpoints, integrated into the system, with database and real-time data synchronization.

  • The security system is integrated with the enterprise management IT system.

  • The system is used by the security service, dispatchers of the transport shop, shipment management, specialists of the badge room, etc.

  • In 2008, the system was awarded by the national award "ZUBR-2008" as the "The best implemented project" in the category "Anti-criminal/Anti-terror".

Projects

Slavneft-JANOS, oil refinery plant. The largest oil refinery plant in the Northern region of Russia.
Assortment-more than 100 names.

Read more